Why is there loose sand on the street after a slurry seal?
Category:
Street Paving
Due to the nature of a slurry seal treatment, there is an anticipated loss of asphalt material. On average, 10 percent of pavement material is lost over the first 30 days. This fluctuates depending on traffic. The contractor will be scheduling periodic street sweepings on the affected roadways during the first 30 days after the treatment has been applied to reduce loose sand.
Updated 6/14/2023 6:02 PM